Our use of cookies

We use necessary cookies to make our site work. We’d also like to set optional analytics cookies to help us improve it. We won’t set optional cookies unless you enable them. Using this tool will set a cookie on your device to remember your preferences.

For more detailed information about the cookies we use, see our cookie policy.


Analytics cookies

We’d like to set Google Analytics cookies to help us to improve our website by collecting and reporting information on how you use it. The cookies collect information in a way that does not directly identify anyone.

:


Share this page on:

Subsea 7 awarded project offshore US Gulf of Mexico

Subsea 7 today announced the award of a substantial1 project for subsea installation services related to Beacon Offshore Energy LLC’s Shenandoah Development, located offshore Gulf of Mexico in water depths up to 6,300 feet.

The project covers the tie-back of four subsea wells to the Shenandoah host facility through a subsea manifold with dual flowlines and risers. The work scope includes engineering, procurement, construction, installation (“EPIC”) and commissioning of the subsea equipment including structures, umbilicals, and production and gas export flowlines. Subsea 7’s scope also includes the wet tow and hook-up of the semi-submersible FPS to the field and mooring system installation.

Project management and engineering will commence immediately at Subsea 7’s offices in Houston, Texas. Fabrication of the flowlines and risers will take place at Subsea 7’s spoolbase in Ingleside, Texas, with offshore operations scheduled for 2024.

Craig Broussard, Vice President for Subsea 7 US, said, “We are pleased to have been selected as a partner for the delivery of the Shenandoah development.  This project allows Subsea 7 to demonstrate the full capacity of our offering, including our extensive involvement in mooring and installation of host facilities, EPIC activities related to the flowline system, and utilizing our industry leading experience and welding capabilities to support the development of high-pressure fields. We look forward to building on the collaborative approach demonstrated by the Shenandoah project to form a long-term cooperative relationship in support of Beacon Offshore Energy’s future growth plans.”

1. Subsea 7 defines a substantial project as being between USD 150 million and USD 300 million.